- To make the license you have to do the following procedures.
- Make the individualizing contract.
- Make the geometrical graffiti.
(3 structural & 3 architect & 3 electrical& 3 drain aging)
- These leaves should be stamping with the guild and advisory cachet doing the following reports.
(clod reports & arithmetic note & advisory certificate) |